Plumbing in Idaho runs on a separate license from general construction. Plumbers hold a certificate of competency issued by the Division of Occupational and Professional Licenses (DOPL) under Chapter 26 of Title 54, "Plumbing and Plumbers," with the Idaho Plumbing Board setting the standards. A plumber working under that certificate doesn't need a separate contractor registration (Idaho Code 54-5205(1)).

The certificate requirement

It's unlawful for any person or business to do plumbing work in Idaho unless the person, or the responsible person representing the business, has passed the state examination and holds a state certificate of competency. The certificate isn't transferable (Idaho Code 54-2610).

The license classes

Section 54-2611 sets three plumbing classes and three specialty classes.

Class Role
Plumbing contractor Plans and supervises plumbing work and is competent to take work on contract and direct qualified employees. A contractor who does plumbing work personally must also qualify as a journeyman, or have a qualified journeyman on all work
Plumbing journeyman Installs, extends and alters plumbing systems as a principal occupation, working for and under the direction of a plumbing contractor
Plumbing apprentice Learning and assisting. May not do plumbing work except under a journeyman's supervision
Specialty contractor, journeyman, apprentice The same structure, limited to the specialty for which the person is certified

When you hire, the contractor certificate is the one that lets the business contract with you. Ask also who the journeyman on your job will be.

The Idaho State Plumbing Code

Plumbing systems in Idaho must be built in substantial accord with the Uniform Plumbing Code published by the International Association of Plumbing and Mechanical Officials, as amended by the Idaho Plumbing Board through rulemaking. Together these are named the Idaho State Plumbing Code (Idaho Code 54-2601(1)).

Cities and counties that choose to enforce plumbing must adopt that code by ordinance. They may amend it for local concerns only after finding good cause and only with at least an equivalent level of protection, and no other base code may be used (54-2601(2), (3)). The effective date of each edition the board adopts is January 1 of the following year. DOPL's State Plumbing Board page links to the current Idaho State Plumbing Code.

Permits

Where your permit comes from

It's unlawful to construct, install, improve, extend or alter any plumbing system, or service lines to it, without first getting a permit from DOPL, except (54-2620(1)):

  • inside counties or cities where plumbing is regulated and enforced by an ordinance or code equivalent to the state chapter, or
  • in an area up to five miles outside city limits where the city has elected to exercise jurisdiction over building drains and sewers for homes converting from septic to city sewer.

So in a city with its own plumbing program, your permit comes from the city. Elsewhere it comes from DOPL, which offers Purchase a Plumbing Permit and Request a Plumbing Inspection on its board page. If you live outside town in Canyon, Bonneville or Kootenai County, ask the county first and then DOPL.

Who can get one

Permits are issued only to a person holding a valid certificate of competency, a business represented by one, or a person or work excepted under certain parts of 54-2602, including an owner doing work on their own single-family home or duplex (54-2620(2)).

Small jobs and repairs

  • A licensed plumber may start work after applying for a permit, before it is issued, when the cost is $500 or less. The permit holder is responsible for the work until the official inspection, which must happen within 60 days of notice (54-2620(3)).
  • No permit is required to clear a stoppage or repair a leak in pipes, valves, fixtures or appliances when the work doesn't involve any functional rearrangement of the system (54-2621).

Adding a basement bathroom or moving a kitchen sink across the room rearranges the system. That isn't a leak repair, so ask for the permit.

Combined permits

If an electrical or HVAC permit issued by DOPL includes part of a plumbing installation, that permit and inspection satisfy the plumbing permit requirement for that part (54-2602(2)).

The homeowner exception

The certificate requirements don't apply to a person who does plumbing work in a single-family or duplex dwelling, including accessory buildings, quarters and grounds, when that person owns or is a contract purchaser of the property. The owner must still comply with the minimum standards and rules of the chapter (54-2602(1)(a)).

The exception is for the owner. A handyman you pay to set a toilet in a new bathroom needs a certificate.

Other exceptions

Section 54-2602 also covers:

  • Sewer, septic and utility contractors working on sewers, sewage disposal systems, and water and drain lines outside the foundation walls. They don't need a plumbing certificate (54-2602(1)(f)).
  • Water treatment installations, which must be inspected by a DOPL agent (54-2602(1)(g)).
  • HVAC and electrical licensees for limited work: the water heater circuit from a disconnect within sight and 50 feet, and for HVAC licensees, gas piping, hydronic piping, and boilers not otherwise inspected by the industrial commission (54-2602(1)(j)).
  • Farm buildings outside city limits that aren't connected to public water or sewer (54-2602(1)(b)).

Local fees

Cities and counties keep the right to collect permit and inspection fees. They may not charge occupational license fees to certified plumbers unless they have qualified plumbing inspectors (54-2619).

License fees and terms

DOPL's State Plumbing Board page lists a $22.50 application fee and:

Certificate Initial Renewal Term
Contractor $147 $108 3 years
Journeyman $29.40 $21.60 3 years
Apprentice $50 $50 5 years
Specialty contractor $147 $108 3 years

Penalties

Doing plumbing work without a certificate or registration, or without a permit, or violating the chapter or board rules is a misdemeanor, with a fine of $10 to $300, up to 30 days in county jail, or both. Each violation is a separate offense (54-2628).

Idaho plumbing in practice

Idaho winters are hard on exposed pipes, and in the Treasure Valley many homes are served by pressurized irrigation districts in addition to drinking water. When you hire a plumber for a new fixture, water heater or main line, ask:

  1. Is the contractor certificate current in DOPL's license search?
  2. Who is the journeyman on site?
  3. Who is pulling the permit, and is it from the city, county or DOPL?
  4. Can I have a certificate of insurance?

See Idaho plumbing costs, find plumbers near you, such as Nampa plumbers, or read the Idaho licensing guide. Problems with a licensee go through the DOPL complaint process.

Sources

Frequently Asked Questions

Can I do my own plumbing in Idaho?

Yes, if you own or are buying a single-family home or duplex and do the work there, including accessory buildings and grounds. You must still follow the state plumbing standards (Idaho Code 54-2602(1)(a)), and you can be issued a permit as an excepted owner (54-2620(2)).

Do I need a permit to fix a leak in Idaho?

No permit is required to clear stoppages or repair leaks in pipes, valves, fixtures or appliances when the work doesn't involve any functional rearrangement of the plumbing system (Idaho Code 54-2621). Moving or adding fixtures does need a permit.

Who issues plumbing permits in Idaho?

DOPL issues plumbing permits, except inside counties or cities that regulate and enforce plumbing by an ordinance or code equivalent to the state chapter (Idaho Code 54-2620(1)). Check with your local building department first.

What plumbing code does Idaho use?

The Uniform Plumbing Code published by IAPMO, with amendments adopted by the Idaho Plumbing Board, which together are called the Idaho State Plumbing Code. Cities and counties that enforce plumbing must adopt it and may amend it only for good cause with at least equivalent protection (Idaho Code 54-2601).