πPest Control in Boise
Quick answer
In Boise, a building permit is needed to reroof, change window or door openings, finish a basement or attic, build a deck more than 12 inches high or a fence over 7 feet, and add any attached patio cover. Plumbing, electrical and mechanical work need their own permits, including a furnace, AC, water heater or bath fan replacement. Historic district projects need a Certificate of Appropriateness first. Planning and Development Services answers permit questions at (208) 608-7070.
Boise's Planning and Development Services issues building, plumbing, electrical and mechanical permits for homes in the city, and its permit list reaches further than many homeowners expect. A reroof, a new window opening, or a furnace swap all need a permit here.
What needs a permit
From the city's residential construction guide (updated May 2023):
Building permit
- Build a one- or two-family home
- Finish an attic, garage or basement into living space
- Build, demolish or add a room, garage, shed, carport or other attached structure
- Build, demolish or move a detached garage or shed over 200 square feet
- New or replacement window or door openings, or widening or narrowing existing ones
- Move, remove or add walls
- Re-roof an existing structure
- A retaining wall 4 feet or taller (from the bottom of the footing), or a 2-foot wall holding a slope or surcharge, which also needs engineering
- A deck more than 12 inches high, or a fence more than 7 feet high
- A patio cover, carport or porch, or enclosing any attached roof area. Any attached patio cover needs a permit, whatever its size.
Mechanical permit
- Installing or changing a heating or cooling system with ductwork or a vent, including replacing a furnace or AC unit
- A wood stove or fireplace insert
- Gas piping between the meter and an appliance
- A gas water heater, or a fuel oil tank
- Bath exhaust fans, dryer vents and range hood vents
Electrical permit
- Installing, changing or repairing any hard-wired electrical system, adding an outlet, switch or light, or replacing a fuse box with breakers
- 110-volt outdoor lighting (low-voltage lighting doesn't need one)
- The city requires a conference with the inspector before starting electrical work
Plumbing permit
- Repairing, replacing, relocating or adding to the piping in your home
- New fixtures such as toilets, sinks, showers, tubs and dishwashers
- An electric water heater
- Replacing fixtures when concealed plumbing is involved
Usually no building permit
- Painting, floor covering, cabinets, countertops and wall coverings. Once a project exposes framing, adds a wall, or moves a sink, tub, shower or toilet, it needs a permit.
- A garden shed of 200 square feet or less, unless it's in a floodplain.
- A driveway, though it needs Planning and Zoning approval.
Historic districts
Building permit rules are the same in Boise's historic districts, but many kinds of work, including windows, siding and tree removal, need a Certificate of Appropriateness from Planning and Zoning. You need it before you apply for a building permit or start work. Call (208) 608-7100. If a contractor quotes new windows for a house in a historic district without mentioning this step, ask.
Foundations, digging and erosion control
- Every building needs a foundation to the 24-inch frost depth, except accessory buildings under 600 square feet, which need at least a 12-inch-wide footing 12 inches below grade.
- An erosion and sediment control permit is required whenever 10 cubic yards or more of earth is disturbed, and for new homes, ADUs and detached garages. Contractors pulling it need an ESC Responsible Person Certification; homeowners doing the work themselves are exempt from the certification.
- Larger stand-alone pergolas and gazebos (over 200 square feet) need a building permit, and the city usually treats them as pole construction that needs an Idaho-licensed engineer.
Doing the work yourself
The city's guide says homeowners may work on their primary residence without registering as a contractor. If you act as your own subcontractor, you must pull the permit and do the work yourself. If someone else does electrical, plumbing or mechanical work, that person must be a State of Idaho registered and licensed contractor in the trade. The city encourages a conference with the inspector before you start.
Check the contractor
Boise doesn't describe a city contractor license in its guide, so the state record is the check. Search the business on DOPL's registration search. A contractor on a project of $2,000 or more needs a Contractors Board registration, and electrical, plumbing and HVAC work needs a contractor licensed by that DOPL board. The Idaho licensing guide has the details.
Before you sign
- Get the registration or license number and look it up.
- On a home project over $2,000, get the Idaho Code 45-525 disclosure before you sign (homeowner disclosure rules).
- List every permit the job needs (building, plumbing, electrical, mechanical, erosion control) and who pulls each one.
- In a historic district, get the Certificate of Appropriateness first.
- Collect lien waivers and the subcontractor list before final payment (Idaho lien law).
The hiring checklist covers each step. Nearby, see Meridian, Garden City, Eagle and Kuna, or all of Ada County. Browse Boise plumbers, electricians, HVAC contractors, roofers, window and door installers and remodelers.
Sources
- City of Boise, Guide to Residential Construction (updated 5/2023): required building, mechanical, electrical and plumbing permits, exemptions, historic districts, foundations, erosion control, homeowner work, phone numbers.
- City of Boise, Homeowner's Guide.
- DOPL registration search: state registration and trade licenses.
Frequently asked questions
Do I need a permit to replace a roof in Boise?
Yes. The City of Boise's residential construction guide lists re-roofing an existing structure among the projects that need a building permit.
Do I need a permit to replace a furnace or water heater in Boise?
Yes. Replacing a furnace or air conditioner, installing or changing any ducted or vented heating or cooling system, and installing or replacing a gas water heater need a mechanical permit. Installing or replacing an electric water heater needs a plumbing permit.
Can I do my own work on my Boise home?
Homeowners may work on their primary residence without registering as a contractor. If you act as your own subcontractor, you must get the permit and do the work yourself. Anyone else doing electrical, plumbing or mechanical work must be a State of Idaho registered and licensed contractor in that trade.
What about Boise's historic districts?
Permit requirements are the same, but many kinds of work, including windows, siding and tree removal, need a Certificate of Appropriateness from Planning and Zoning before you apply for a building permit or start work. Call (208) 608-7100.