Idaho has one statute that speaks directly to homeowners before they sign with a contractor: Idaho Code 45-525. Its stated purpose is to protect owners and buyers of residential property by making general contractors disclose the risk of liens. It requires two documents, one at the start of the job and one before you make the last payment.

When the law applies

The disclosure duty applies to a general contractor, defined as a person who enters into an agreement over $2,000 with (45-525(5)(a)):

  • a homeowner or prospective buyer, to build, alter or repair residential real property, or
  • a prospective buyer, to purchase newly built property.

"Residential real property" means owner-occupied or non-owner-occupied property with one to four dwelling units (45-525(5)(b)). A rental duplex counts. So does a fourplex.

The term doesn't include subs, suppliers or rental companies that have no direct contract with you. The duty sits with the contractor you hired.

The emergency exception

The section doesn't apply when you or your agent initiate the contact with the contractor to get repairs needed for a bona fide emergency, or to make necessary repairs to your electrical, plumbing or water system (45-525(6)). A burst pipe in January, or a dead panel, falls here. A kitchen remodel doesn't.

Disclosure 1: before you sign

Before entering into the contract, the general contractor must give you a disclosure statement with an acknowledgment of receipt for you to sign. The contractor keeps proof that you received it and gives you a copy (45-525(2)).

The statement must tell you four things:

Your right What it means Source
Lien waivers You may require the general contractor to obtain lien waivers from subs who provide services or materials to it, at your reasonable expense 45-525(2)(a)
Proof of insurance You may get proof that the contractor has general liability including completed operations, and workers' compensation for employees as required by Idaho law 45-525(2)(b)
Title insurance You must be told you can buy an extended title insurance policy covering certain unfiled or unrecorded liens 45-525(2)(c)
Surety bond You may require a surety bond up to the value of the project, at your expense 45-525(2)(d)

DOPL's Contractors Board FAQ repeats these four items as guidance to registered contractors.

Read the form before you sign the receipt. Then decide which rights you want to use. For a large remodel or addition, asking for lien waivers as each payment goes out is a good place to start. Insurance proof costs you nothing. The insurance requirements are explained on Idaho contractor insurance requirements.

Disclosure 2: before final payment

The second disclosure is a written list, signed by the general contractor, of the business names, addresses and telephone numbers of all subcontractors, materialmen and rental equipment providers who (45-525(3)(a)):

  • had a direct contract with the general contractor, and
  • supplied materials or performed work on your property worth more than $500.

The contractor must give it to you within a reasonable time before your final payment for the construction, alteration or repair, or before closing if you are buying a new home.

Two more parts of subsection (3) help you use the list:

  • Everyone named on it is authorized to tell you, or your agent, the balance they are owed (45-525(3)(b)). You can call the lumberyard and the drywall sub and ask whether they've been paid before you release the last check.
  • The contractor isn't liable for errors in the list that weren't within its personal knowledge (45-525(3)(c)). It doesn't have to list second-tier subs it didn't hire.

Why the list matters: liens

Anyone who works on or supplies your home can file a lien for what they're owed, including subs and suppliers you never met (Idaho Code 45-501). They have 90 days after finishing their work to file it (45-507(2)). If you pay your contractor in full and the contractor doesn't pay the window supplier, the supplier can still go after your property.

The final-payment list tells you who to check with. The lien waivers you can require under 45-525(2)(a) are how you document that they were paid. The lien process is covered in full on Idaho mechanics' lien law.

What happens if a contractor skips it

It's a consumer protection violation

Failing to provide complete disclosures to the homeowner or prospective buyer is "an unlawful and deceptive act or practice in trade or commerce" under the Idaho Consumer Protection Act (45-525(4)).

Under that Act, a person who buys services and suffers an ascertainable loss from an unlawful practice may treat the agreement as voidable or sue for actual damages or $1,000, whichever is greater, plus attorney's fees if they win (Idaho Code 48-608). See the Idaho Consumer Protection Act and contractors.

It can weaken a lien claim

When a lien claim is for work or materials subject to 45-525, the claim filed with the county recorder must contain the required proof of disclosure and acknowledgment of receipt (45-507(3)(e)). A general contractor who never had you sign the receipt has a problem if it later tries to lien your house.

It can lead to discipline

The Idaho Contractors Board may discipline a registered contractor who violates the Consumer Protection Act, including by suspension, revocation or a civil penalty of up to $1,000 (Idaho Code 54-5215(2)(b)). See how to file a DOPL complaint.

What the Attorney General recommends

The Idaho Attorney General's Consumer Protection Manual describes both disclosures and adds practical advice for home improvement contracts:

  • Get the contract in writing, with the start and finish dates, the full price, and a payment schedule.
  • Don't agree to a large down payment. Pay as work progresses, and consider holding back a sum such as 10 percent until the job is done right.
  • Keep a job file with the contract, change orders, invoices, canceled checks and lien releases from subcontractors and suppliers.
  • Before final payment, get proof that subs have been paid.

A simple routine

  1. At bid time, confirm the contractor's registration in DOPL's registration search.
  2. Before signing, get the 45-525 disclosure, read it, and sign the receipt. Keep your copy.
  3. Ask for the insurance certificate right away.
  4. At each payment, ask for lien waivers from the subs and suppliers paid from that draw.
  5. Before the last payment, get the signed sub and supplier list, call the larger ones, and collect final waivers.
  6. Keep everything for at least the lien period.

The hiring checklist has more steps, and the Idaho licensing guide explains who needs which credential.

Sources

Frequently Asked Questions

When does an Idaho contractor have to give me the 45-525 disclosure?

Before entering into any contract over $2,000 with a homeowner or residential purchaser to build, alter or repair improvements on residential real property, or to sell newly built property. The statement includes an acknowledgment of receipt for you to sign, and the contractor must keep proof and give you a copy (Idaho Code 45-525(2)).

What is the final-payment list under Idaho law?

A written statement, signed by the general contractor, listing the business names, addresses and phone numbers of every subcontractor, materialman and rental equipment provider it hired directly that supplied materials or work worth more than $500. It's due within a reasonable time before your final payment (Idaho Code 45-525(3)).

What happens if the contractor never gave me the disclosure?

Failing to give complete disclosures is an unlawful and deceptive act under the Idaho Consumer Protection Act (Idaho Code 45-525(4)). Also, a lien claim for work covered by 45-525 must include proof of the disclosure and your acknowledgment of receipt (45-507(3)(e)).

Does the disclosure law apply to emergency repairs?

No, when you or your agent start the contact to get repairs for a bona fide emergency, or necessary repairs to your electrical, plumbing or water system (Idaho Code 45-525(6)).