A roof in Idaho has to carry the snow that falls where it sits. Idaho doesn't set one snow load for the whole state. It leaves the number to the building department that issues your permit. This page explains who sets it, where the published values come from, and what to ask before a roof, addition or solar project.
Who sets snow loads in Idaho
The Idaho Building Code Act requires local governments that issue building permits to adopt the Idaho Residential Code and the International Building Code (Idaho Code 39-4116(2)). Within the residential code, local governments may amend by ordinance, to reflect local concerns (39-4116(4)(c)):
- Part I, Administrative
- Part II, Definitions
- Part III, Section R301, Design Criteria
- Part IX, Appendices
Design criteria are where climate-driven values such as snow load are stated. Local building departments publish them on a design criteria sheet alongside their adopted codes. The current state rules adopt the 2018 International Residential Code and International Building Code (IDAPA 24.39.30).
For buildings under DOPL's own jurisdiction, mainly state buildings, DOPL's building FAQ says snow loads are to be per the International Building Code, and refers designers to ATC Hazards by Location for values.
Ground snow load vs. roof snow load
Design criteria sheets often list two numbers, and they aren't the same thing.
- Ground snow load is the weight of snow expected on the ground at the site, in pounds per square foot (psf).
- Roof snow load is the load the roof is designed for. Local rules may set a minimum roof value separate from the ground value.
When a contractor quotes "a 40-pound roof," ask which number that is.
What Idaho jurisdictions publish
Here's what three official design criteria documents say. They show how wide the range is.
| Jurisdiction | Published snow load criteria | Source |
|---|---|---|
| City of Twin Falls (residential) | Ground snow load 15 psf. Minimum uniformly distributed design roof load 25 psf by local ordinance | Twin Falls residential design criteria |
| City of Coeur d'Alene | Ground snow load 60 psf. Roof snow load 40 psf | Coeur d'Alene adopted codes and design criteria (PDF) |
| Kootenai County | Flat roof snow loads by county map zone: Zone A minimum 40 psf, Zone B 50 psf, Zone C 60 psf, all with prescriptive IRC rules. Zone D requires an Idaho licensed engineer to determine parcel-specific loads from "Ground and Roof Snow Loads for Idaho" | Kootenai County residential building guide (PDF) |
These are examples, not a statewide table. Your city or county may use different numbers, may tie them to elevation, or may have changed them since these documents were published. Kootenai County's sheet and Coeur d'Alene's sheet also list a 24-inch minimum frost depth for footings, and Twin Falls lists 24 inches, which matters for any addition or deck footing.
The University of Idaho snow load studies
Engineers and building departments in Idaho draw on two studies from the University of Idaho's Department of Civil Engineering, hosted on the University of Idaho Library's Ground and Roof Snow Loads for Idaho page:
- Ground Snow Loads for Idaho, 2015 Edition, by Hussain Al Hatailah, Bruce R. Godfrey, Richard J. Nielsen and Ronald L. Sack, with an interactive 2015 map
- Ground and Roof Snow Loads for Idaho, 1986, by Ron Sack and A. Sheikh-Taheri, with an interactive 1986 map
The page carries a disclaimer: the final design snow loads are the responsibility of the engineer, architect, local building official and/or contractor in charge of the project. In other words, the map is a reference, and the building department's adopted value controls your permit. Kootenai County's guide names "Ground and Roof Snow Loads for Idaho" as the basis for engineered loads in its Zone D.
Projects where snow load matters
Re-roofing
If the job changes the roofing material, adds a layer or reframes part of the roof, ask the building department whether your re-roof needs a permit and a structural review. Under Idaho Code 39-4111(3), a permit can't require upgrades to unaffected existing parts that met the code when built, unless the building department identifies a specific substantial safety hazard the new work creates.
Additions, covered patios and carports
New framing is designed to the snow load in your jurisdiction's design criteria. Where a new roof meets an existing one, ask your designer or contractor how the plans account for snow at that junction.
Solar panels
Rooftop solar puts new equipment on the roof structure. Before signing:
- Ask for the structural review. Ask whether the building department requires engineering for the racking and roof framing at your design snow load.
- Ask who does the electrical permit. Homeowner grid-tied renewable systems are subject to a preplan review under local policies before the electrical permit is purchased (Idaho Code 54-1016(2)(a)). Electrical work needs a licensed electrical contractor unless you do it yourself on your own home. See the electrical license page.
- Get the solar disclosure. Under the Residential Solar Energy System Disclosure Act, a solar retailer must give you a separate written disclosure before you sign. It must include the state contractor registration number of the installer and a description of the system, including panel make and model, system size and positioning of the panels on your property (Idaho Code 48-1804, 48-1805).
Questions to ask before you build
- What is the ground snow load and the minimum roof snow load for my address? Get the jurisdiction's design criteria sheet.
- Does my parcel need an engineered snow load? Some areas, such as Kootenai County's Zone D, require one.
- Is the contractor designing to that number, and will the plans or truss drawings show it?
- Does the job need a permit and structural review? Ask before tear-off day.
- Is the contractor registered? Check DOPL's registration search. The registration number must be on the permit (Idaho Code 54-5209).
For permit basics, see Idaho building permit requirements. To find roofers, see roofers or Coeur d'Alene roofers, and compare Idaho roofing costs. The hiring checklist and Idaho licensing guide cover the rest.
Sources
- Idaho Code 39-4116, local adoption and amendment: local authority over R301 design criteria
- Idaho Code 39-4111, permits: no forced upgrades of unaffected parts
- IDAPA 24.39.30, Rules of Building Safety (PDF): 2018 IRC and IBC adopted
- DOPL Building Code Board FAQ: snow loads per IBC for DOPL projects, ATC Hazards by Location
- City of Twin Falls, Design Criteria Residential: 15 psf ground, 25 psf roof minimum, 24-inch frost depth
- City of Coeur d'Alene, Adopted Codes and Design Criteria (PDF): 60 psf ground, 40 psf roof
- Kootenai County, Residential Building Guide (PDF): snow zones A to D, engineered loads, 24-inch frost depth
- University of Idaho Library, Ground and Roof Snow Loads for Idaho: 2015 and 1986 reports and maps, disclaimer
- Idaho Code 54-1016, electrical exemptions: preplan review for homeowner grid-tied renewables
- Idaho Code 48-1804 and 48-1805: solar disclosure contents
- Idaho Code 54-5209, permits and registration number
Frequently Asked Questions
What is the snow load requirement in Idaho?
There isn't one statewide number. Local building departments set residential design criteria under Idaho Code 39-4116(4)(c). Published examples: Twin Falls, 15 psf ground and 25 psf minimum roof load; Coeur d'Alene, 60 psf ground and 40 psf roof; Kootenai County, zone minimums of 40, 50 and 60 psf for flat roof snow loads, with engineered loads in Zone D.
Where can I find Idaho ground snow load maps?
The University of Idaho Library hosts 'Ground Snow Loads for Idaho - 2015 Edition' and the 1986 'Ground and Roof Snow Loads for Idaho,' each with an interactive map. The site says final design snow loads are the responsibility of the engineer, architect, local building official or contractor on the project.
Do I need an engineer for snow loads in Idaho?
Sometimes. Kootenai County, for example, requires an Idaho licensed engineer to determine parcel-specific design snow loads in its Zone D, using 'Ground and Roof Snow Loads for Idaho.' Ask your building department whether your parcel or project needs one.
What snow load does DOPL use for state buildings?
DOPL's building FAQ says snow loads for its projects are to be per the International Building Code, and points to ATC Hazards by Location for values. Private homes follow the local jurisdiction's criteria.