Quick answer
McCall's Building Department issues building permits, including for every reroof, fence, re-siding job and shed over 200 square feet, and needs the contractor's state registration or license number on the permit. Electrical, mechanical, plumbing and most fireplace permits and inspections come from the Idaho Division of Occupational and Professional Licenses. The city designs for a 150 psf ground snow load and a minimum 120 psf roof load, and no work, including tree removal, may start before a permit is issued.
McCall, in Valley County on Payette Lake, writes its building rules for deep snow. The design ground snow load is 150 psf, and the city requires a permit before any site work starts, down to removing a tree.
Check the contractor
A city memo on professional and contractor registration says building permits issued by the McCall Building Department require a registration or license number for the professional or contractor listed, and that the design professional's and general contractor's numbers go on the permit and are posted on the jobsite. Licensed professionals list their license instead of a registration. The memo repeats the state exceptions: an owner-builder of a primary residence they'll live in for at least 12 months, and work under $2,000.
The city's pages don't describe a separate city contractor license. Check the number on DOPL's registration search. The Idaho licensing guide explains the state rules.
Who issues permits
| Work | Permit and inspections from |
|---|---|
| Building, reroof, fence, demolition, accessory structures | City of McCall Building Department |
| Electrical, mechanical, plumbing | Idaho Division of Occupational and Professional Licenses |
| Fireplace installations, other than wood-burning or pellet inserts | Idaho Division of Occupational and Professional Licenses |
That split is on the city's Construction Information page. Applications go through the city's online permit portal. For questions or to coordinate a submission, call (208) 634-7052. Inspections need 24 hours' notice, and the city allows 48 hours to inspect.
What needs a permit
From the city's Building page:
Permit required
- New buildings, remodels and additions
- Interior remodels that add or move walls, structural repairs, or new insulation
- Garages, and sheds over 200 square feet
- Fences
- Re-roofs, on all projects
- Re-siding the entire structure
- Any patio cover, awning or pergola attached to another structure, regardless of size
- Decks over 200 square feet, or over 30 inches off the ground
- Retaining walls over 48 inches
- Windows or doors where the opening is enlarged or moved
- Site grading, grubbing and tree removal
No permit
- Sheds 200 square feet or less (residential)
- Finish work only: painting, tiling, carpeting, cabinets and other non-structural work
- Windows and doors replaced in the same size openings
McCall City Code 3.8.02(G) says no construction work, including grading, blasting, filling, trenching or tree removal, may start until a valid building permit is issued. The Design Criteria page adds that tree removal is limited to 20% of the trees on a lot, and removing any tree 12 inches in diameter or larger needs the city arborist's approval.
Fences can't exceed 4 feet within 20 feet of the front property line or 6 feet elsewhere, and chain-link isn't permitted.
Snow load and design criteria
| Item | McCall value |
|---|---|
| Ground snow load | 150 psf |
| Roof snow load | 120 psf minimum |
| Seismic Design Category | D |
| Wind | 115 mph (or per IBC), Exposure B |
| Frost depth | 24 in |
Those loads drive framing on every roof, deck cover and addition. The city also publishes guidance on snow weight and roof shoveling. Exterior lighting must follow McCall's Dark Sky Ordinance, building height is limited to 35 feet, and covered decks and patios count at 100% toward lot coverage. The snow load guide explains how Idaho sets roof loads.
Fees
From the city's Building and Planning fee page:
| Item | Fee |
|---|---|
| Building permit and plan review | By valuation; plan review is 65% of the permit fee |
| Reroof | Permit fee only, figured on 50% of total project cost |
| Fence permit | $275 |
| Demolition permit | $200 |
| Fireplace permit | $130 |
| Fire district impact fee, new residence | $1,165 |
| Water capitalization fee, new residence | $7,132 per ERU |
Sewer service is run by a separate district, not the city; the fee page says to contact the Payette Lakes Recreational Water and Sewer District for its fees.
Before you sign
- Look up the state registration and make sure the number is on the permit.
- On a home project over $2,000, get the Idaho Code 45-525 disclosure before you sign (homeowner disclosure rules).
- Confirm the city permit, and any DOPL electrical, plumbing or mechanical permit, is issued before any site work or tree removal.
- Collect lien waivers and the subcontractor list before final payment (Idaho lien law).
The hiring checklist covers each step. Down the road toward the Treasure Valley, see Emmett and Boise, or all of Valley County. Browse McCall plumbers, electricians, HVAC contractors, painters, landscapers and remodelers.
Sources
- City of McCall, Building: what needs a permit, exemptions, fences, windows, decks, contact.
- City of McCall, Construction Information: DOPL electrical, mechanical, plumbing and fireplace permits; codes; permit-before-work rule.
- City of McCall, Design Criteria & Guidelines: snow load, seismic, wind, frost depth, tree removal, lighting, height.
- City of McCall, Building and Planning Fee Page: permit, impact and utility fees.
- City of McCall, Professional and Contractor Registration memo (PDF): registration or license number on permits.
- DOPL registration search: state registration and trade licenses.
Frequently asked questions
Who issues electrical and plumbing permits in McCall?
The state. The city's Construction Information page says permits and inspections for electrical, mechanical, plumbing and fireplace installations (other than wood-burning or pellet inserts) are performed by the Idaho Division of Occupational and Professional Licenses.
Do I need a permit to reroof in McCall?
Yes. The Building page says a roof permit is required for re-roofing on all projects. The fee page says to take 50% of the total project cost and run it through the city's fee calculator, and only the permit fee (not plan review) is due.
What snow load does McCall require?
The city's Design Criteria page lists a 150 psf ground snow load with a minimum 120 psf roof load, Seismic Design Category D, 115 mph wind (Exposure B) and a 24-inch frost depth.
Do I need a permit for a fence or new windows in McCall?
Fences need a permit, which costs $275. They can't exceed 4 feet within 20 feet of the front property line or 6 feet elsewhere, and chain-link isn't allowed. Windows need no permit if the openings don't change size; enlarging or moving them does.
Does McCall check contractor registration?
Yes. A city memo says building permits require a registration or license number for the professional or contractor listed, and the design professional's and general contractor's numbers go on the permit and are posted on the jobsite.