Quick answer
Hailey's Community Development Department, (208) 788-9815, takes building permit applications, while its building official and inspection staff are listed as State of Idaho DOPL employees and inspections are scheduled through DOPL's online services. A permit is needed to reroof, replace windows, build any fence, or add a shed over 120 square feet; painting, residing and new floor coverings don't need one. The city designs for a 100 psf roof snow load and a 120 psf ground snow load.
Hailey, the Blaine County seat in the Wood River Valley, takes permit applications through its Community Development Department but lists state staff as its building official and inspectors. Its design roof snow load is 100 psf.
Who handles permits
The city's Building Services page lists a city building permit assistant at (208) 788-9815, and lists the building official and inspection staff under the State of Idaho, Division of Occupational and Professional Licenses. In practice:
- Applications and fees go through the city's Community Development Department. Forms are on the Forms & Fees page.
- Building inspections are scheduled online through DOPL's online services, per the city's inspections page. For a permit issued November 1, 2024 or later, enter the seven-digit number at the top right of the permit, below the city permit number. Older permits use a state number in the format BLDXXXX-XXXXX.
The city's pages don't say who issues electrical and plumbing permits in Hailey. Ask Community Development when you apply.
Check the contractor
The city's pages don't describe a city contractor license, so the state record is the check. Search the business on DOPL's registration search. A contractor on a project of $2,000 or more needs a Contractors Board registration, and electrical, plumbing and HVAC work needs a contractor licensed by that DOPL board. The Idaho licensing guide explains the state rules.
What needs a permit
From the city's Building Services FAQs:
| Project | Permit? |
|---|---|
| Remodel (erect, build, enlarge, alter, repair, move, improve, remove, convert or demolish) | Yes |
| Re-roof | Yes (a small patch is exempt) |
| Window replacement | Yes |
| Any fence | Yes, through planning and zoning staff |
| Shed over 120 sq ft, or attached to the house or garage | Yes |
| Painting, residing, new carpet, tile or linoleum | No |
A shed that needs a permit must sit on a concrete foundation. Sheds can't exceed 12 feet in height, and those 120 square feet or under generally sit at least 3 feet from side and rear lot lines and from other accessory structures.
Fences can't exceed 4 feet within the required front yard setback, or 6 feet within the side and rear setbacks. On a corner lot, the fence can't be within 75 feet of the centerline intersection of the two streets. Barbed wire and electric fences need Planning and Zoning Commission approval. Fence rules are in Hailey Municipal Code Title 17, Chapter 17.08A.
Snow load and design criteria
The FAQ lists Hailey's design criteria:
| Item | Hailey value |
|---|---|
| Roof snow load | 100 psf |
| Ground snow load | 120 psf |
| Frost depth | 24 in |
| Seismic Design Category | D1 |
| Wind speed | 103 mph, gusts to 115 mph |
Those loads change the cost of a deck roof, a carport or an addition. Make sure the plans show them. Title 15 of the city code has Hailey's building code amendments, and the snow load guide explains how Idaho sets roof loads.
Other permits to know about
The Forms & Fees page lists several applications beyond the building permit: a Flood Hazard Development Permit, Design Review, a Historic Demolition Permit, and water, wastewater, irrigation and encroachment permits for new construction. New fees took effect October 1, 2026, for applications certified complete on or after that date; the current municipal fee schedule is on that page.
Construction hours are 7 a.m. to 7 p.m. on weekdays, 8 a.m. to 7 p.m. on Saturdays and 9 a.m. to 7 p.m. on Sundays.
Before you sign
- Look up the state registration and any trade license.
- On a home project over $2,000, get the Idaho Code 45-525 disclosure before you sign (homeowner disclosure rules).
- Ask whether your lot needs flood, design review or historic approval, and confirm the permit is issued before work starts.
- Collect lien waivers and the subcontractor list before final payment (Idaho lien law).
The hiring checklist covers each step. Elsewhere in south-central Idaho, see Twin Falls and Jerome, or all of Blaine County. Browse Hailey roofers, gutter cleaners, plumbers, electricians, HVAC contractors and remodelers.
Sources
- City of Hailey, Building Services: city and DOPL staff roles, phone.
- City of Hailey, Building Services FAQs: permit answers, fences, sheds, design criteria, construction hours.
- City of Hailey, Building Inspections & Permit Reports: inspection scheduling through DOPL.
- City of Hailey, Forms & Fees: applications, October 2026 fee schedule.
- DOPL registration search: state registration and trade licenses.
Frequently asked questions
Do I need a permit to reroof in Hailey?
Yes. The city's Building Services FAQ says a re-roof is considered a repair or remodel and needs a permit. A small patch job does not. The city has a Re-Roof Permit Application on its Forms & Fees page.
Do I need a permit for a fence in Hailey?
Yes. All fence permits are reviewed and approved by Community Development's planning and zoning staff. Fences can't exceed 4 feet within the required front yard setback or 6 feet within the side and rear setbacks.
What snow load does Hailey use?
The Building Services FAQ lists a 100 psf roof snow load, a 120 psf ground snow load, a 24-inch frost depth and Seismic Design Category D1. Title 15 of the city code has the building code amendments.
How do I schedule a building inspection in Hailey?
Through DOPL's online services at edopl.idaho.gov. Permits issued from November 1, 2024 on use the seven-digit number at the top right of the permit, below the city permit number; older permits use a state number in the format BLDXXXX-XXXXX.
What are Hailey's construction hours?
7 a.m. to 7 p.m. on weekdays, 8 a.m. to 7 p.m. on Saturdays, and 9 a.m. to 7 p.m. on Sundays, per the city's Building Services FAQ.